Compare cloud placement and plan the move.
Decide what to keep, move or replace across cloud and private infrastructure. We plan the migration, define recovery steps and compare the destination with the source, recording any differences before handover.
Start here
Before a cutover date is committed, this is the planning engagement that maps the dependencies, the wave sequence, the rollback criteria, and the reconciliation method.
Migration & Cutover Plan
Built for the IT Director planning a server move or M&A consolidation who cannot afford Friday-night downtime.
The cloud journey
Illustrative sample · constructed example
Can this workload tolerate losing the external connection?
Illustrative workload · document-processing service
- Observation
- Peak demand, acceptable interruption and recovery target are missing.
- Decision
- Insufficient evidence to recommend
- Next action
- Measure demand and agree operating and recovery requirements before pricing equivalent options.
Should we move, and to which cloud?
Before anything moves, decide what is worth moving and where. Readiness is scored, the platforms are compared against your real needs, and the business case is built.
Illustrative sample · constructed example
Is the source inventory complete enough to plan the first wave?
Planning excerpt · first cutover wave
- Observation
- Archive volume and application owner are not yet confirmed.
- Decision
- Keep the estimate conditional
- Next action
- Record assumptions and request the missing inputs before fixing the wave plan.
Move mail, files, tenants, or servers on a scheduled cutover.
Mail, files, tenants, collaboration, and servers, each planned to protect mail flow, access, permissions, and business continuity, with route-specific validation and rollback criteria.
See all migration routesIllustrative sample · constructed example
What stops working if the identity connection fails?
Constructed dependency · application sign-in
Local placement does not remove the directory or network dependency. Name both owners before changing the application’s location.
- Observation
- A local application depends on directory authentication and a network route to that directory.
- Decision
- Keep both dependencies on the target map.
- Next action
- Name the application and network owners; test the agreed failure and recovery path before changing placement.
Modernize what is already there.
Rehost, replatform, or refactor aging servers and apps onto supported, cheaper targets, and bring desktops into Azure Virtual Desktop or Windows 365.
Illustrative sample · constructed example
Which correction must happen before a cost can be removed?
Constructed roadmap · old mail relay
- Observation
- A server renewal is pending, but an application still uses its SMTP relay.
- Decision
- Do not count the server cost as removable yet.
- Next action
- Price and test the replacement relay, then review retirement and its cost assumptions.
Right-size the bill and lock down governance.
Cut Azure waste, put a landing zone and governance baseline in place, and keep the Microsoft 365 tenant clean and well-licensed.
Not sure where you are in the journey?
Describe what has to move and when. We’ll review your request and follow up about scope and next steps.