Supporting technical capability

Improve slow Power BI reports and document the calculations.

A short fixed-fee engagement that improves the agreed parts of a slow Power BI model with documented measures and a performance log, so the reports load quickly and the numbers hold up.

Illustrative sample · supporting capability

Is a slow visual caused by its measure, model or source?

CONSTRUCTED EXAMPLETechnical record
Constructed review · monthly total
  1. SOURCEMonthly transactions · model relationships
  2. DEFINITIONMonthly total measure over the intended relationship
  3. DECISIONAmbiguous relationship: confirm totals before changing the model.

REFRESH CONDITIONCompare the same query and totals in controlled runs; record the dataset refresh used.

Observation
The same total is calculated over a wide table and crosses an ambiguous relationship.
Decision
Inspect the model and query before claiming a speed improvement.
Next action
Capture the query plan, isolate the measure, check totals and compare controlled runs. No performance gain is assumed.

This capability can inform the next service. Its inclusion, price and calendar must be agreed in that service’s scope; following the link does not make it included.

Explore the relevant next service

Technical context

When this work applies

  • Reports are slow and refreshes take too long.
  • Measures are inconsistent and nobody trusts the data model.
  • The model grew organically and nobody documented how it works.

Possible outputs

Outputs to agree in scope

Fix log for the data model

A before and after of refresh time, model size, and slow queries, with every fix recorded.

Documented measures

Each DAX measure named, explained, and verified so the numbers are trusted again.

Performance recommendations

What to change next to keep the model fast as it grows.

Commercial & delivery basis

The scope and conditions of the work.

Delivery window

This supporting capability has no separate confirmed delivery window. The proposal names its scope and calendar.

How engagements are scoped
Capability scope to confirm
  • Model review
  • DAX cleanup log
  • Documented measures
  • Performance recommendations
Scope assumptions
  • One existing Power BI model or PBIX file
Exclusions
  • A full rebuild or a new report suite
  • A data warehouse build
Required access
  • The existing PBIX file or workspace access
  • Read access to the underlying data sources
  • A 30-minute kickoff with the report owner

Acceptance

The agreed completion standard.

The engagement is complete when the fix log, the documented measures, and the speed recommendations are delivered and walked through.

Discuss the work

Tell us what you need to change.

Share the systems involved, why the change is needed and your deadline. We clarify the work, responsibilities and information needed for a proposal.

Discuss this project